HẢI VÂN TUNNEL EXTENSION PROJECT

Place:  From the north of tunnel is Hue and from the south of tunnel is Danang.

Project Scale:

- Total length of tunnel: 6.2 Km

- Designed speed limit during 1st stage is 60Km/h, and 2nd stage is 80Km/h

Project budget: 7,300 Bil VND.

Project time: Start in the beginning of 2016, complete and start the usage in 2019.

Contractors:

- Investor: Công ty CP Đầu tư Đèo Cả (Hải Thạch Group is one of the main investors).

- Contractor: Công ty cổ phần đầu tư xây dựng Hải Thạch